The Minister of Transport is following up on the progress in the implementation rates of the East Nile Monorail Project 24/12/2023 | 10:30 AM
Cinque Terre

For the second time in less than 10 days, Team Engineer/ Kamel Al-Wazir - Minister of Transport conducted an inspection tour to follow up on the progress in the implementation rates of the East Nile Monorail Project, which extends from the Stadium Station in Nasr City to the Adala City Station in the Administrative Capital, with a length of 56.5 km and includes 22 stations and is being implemented from During the alliance of companies (Alstom - Orascom - Arab Contractors) This tour comes within the framework of implementing the directives of His Excellency President Abdel Fattah El-Sisi, President of the Republic, to expand the establishment of a network of green, sustainable, and environmentally friendly public transportation. The tour included following up on the final touches to finish the finishing work of Field Marshal Tantawi Station and the progress of the work being carried out at the various stations up to Station No. 1 in Youssef Abbas in Nasr City, where the internal finishing and external cladding works are being carried out after the completion of the implementation of its concrete and metal structure. The Minister was briefed on the passengers’ itinerary. At the stations, starting from the garage for each station, passing through the pedestrian escalators, then the ticket windows on the station platforms The Minister followed up on the progress in the rates of implementation of the project path, stressing the necessity of continuing to carry out the work of restoring the thing to its original state in the various project sectors, as happened in the Field Marshal sector. The total completion rate of the project was reviewed and what it included in terms of construction work, finishing works, electromechanical work for the stations, and the work of systems and mobile units. The Minister directed that All work is carried out in parallel for speedy completion The Minister also reviewed with the Chairman and leaders of the National Tunnels Authority the progress in the rates of implementation of the command and control center, which has an area of about 85 acres (356,248 m2), which includes 13 buildings, as well as the rate of supply of trains, as each one arrived. The entire trains of this line number 40 trains, with a total of 160 cars, with each train consisting of 4 cars. The Minister of Transport presented with the head and leaders of the National Tunnels Authority the implementation of the commercial exploitation plan for the project, whether through advertisements placed on monorail poles or stations within the comprehensive plan of the Ministry of Transport for optimal commercial exploitation. For all projects to achieve a financial return that contributes to providing distinguished services to the passenger public and the sustainability of these projects. It is worth noting that the total length of the two monorail projects (East/West Nile) is 100 km with 35 stations, and the capacity of each of the two monorail lines is 600 thousand passengers per day. The monorail train consists of 4 cars, and it is planned to increase the number of cars to 8 cars. With the increase in population density in the new urban areas it serves... The Cairo East Monorail will contribute to linking the Greater Cairo region to the new urban areas and cities to the east (New Cairo - the Administrative Capital), as well as contributing to facilitating the movement of employees and expatriates from Cairo and Giza to New Cairo and the Administrative Capital, as it is integrated with the third line of the metro at the Stadium station. In Nasr City and with the electric train at the City of Arts and Culture station in the New Administrative Capital The monorail, which is being implemented in Egypt for the first time, will represent a major cultural shift in mass transportation, which is characterized by being fast, modern, and safe, saves fuel consumption, reduces environmental pollution rates, eases traffic congestion on main axes and streets, and attracts passengers to use it. Instead of private cars to reduce fuel and fuel consumption. It is operated by electric power (environmentally friendly) and the monorail is implemented in places where it is difficult to implement metro lines and other means of railway transportation. It is distinguished by the possibility of implementing it in narrow and crowded streets that have large horizontal curvatures and does not require electricity. There are many modifications to the facilities, and expropriations are greatly reduced. The monorail is distinguished by its implementation on an overhead track in the central island of the streets through which it passes and does not occupy any parts of the street, which means that traffic in these streets is not affected.

×