Implementation of the extension of the second metro line to the ring road


  1. Implementation of the extension of the second metro line to the ring road


    The second metro line will be extended from after Shubra El-Kheima station by a length of 3.2 km and 3 stations to reach the Ring Road to achieve service interchange with the BRT shuttle bus.

  2. Project objective


    - To accommodate the increasing transportation demands along the route.

    - To integrate with the Bus Rapid Transit (BRT) system and other public and private transportation options on the ring road to reduce congestion, accidents, and traffic jams. - To provide a safe, modern, and environmentally friendly mode of transportation. - To reduce vehicle usage, thereby lowering maintenance costs and emissions from surface vehicles.

Implementation of the extension of the second metro line to the ring road IMAGES

Implementation of the extension of the second metro line to the ring road VIDEOS

×