Implementation of the second and third phases of the Alexandria Metro
-
Implementation of the second and third phases of the Alexandria Metro
The second phase of the Alexandria Metro extends from El-Zaheria station to kilometer 21 along the Alexandria/Matrouh road, with a total length of 31 km. This phase includes an elevated track after El-Zaheria station, followed by a combined surface and elevated track within the railway right-of-way until reaching El-Max station. It then continues on an elevated track to kilometer 21 along the Alexandria/Matrouh road, comprising 21 stations (6 at ground level and 15 elevated).
.
-
The third phase of the Alexandria Metro (kilometer 21 on the Alexandria-Matrouh road) extends from kilometer 21 to Borg El Arab Airport, aiming to connect Alexandria to the airport and facilitate passenger transfers with Line 1 of the high-speed rail network at Borg El Arab station
Implementation of the second and third phases of the Alexandria Metro IMAGES
Implementation of the second and third phases of the Alexandria Metro VIDEOS