Phase 5 of Metro Line 3
-
Phase 5 of Line 3 (Heliopolis-Cairo Airport)
The fifth phase of the third line of the metro (Heliopolis - Cairo Airport) extends over a length of 9.2 km and has 7 stations to connect with Cairo International Airport and serve the residential area along the route.
Phase 5 of Metro Line 3 IMAGES
Phase 5 of Metro Line 3 VIDEOS