Development systems of line 2 metro


  1. Development of line2 metro systems


    Some systems will be updated and replaced with new ones, such as signaling, central control and communications systems, and an additional 25-year lifespan will be increased. A study will also be conducted (adding doors on sidewalks - a case study of civil works for the line - a case study of systems not covered by the contract).

  2. The aim of the project


    Raising the efficiency of some systems, such as air conditioning, ventilation, drainage, elevators and
    railway engineering, and increasing their life span by an additional 25 years.
    Overcoming the problem of lack of spare parts due to outdated systems
    Adding some modern systems aimed at improving the service provided to the public of passengers
    Reducing the cost of maintenance, which will have a return on the economy and reduce operating
    costs

  3. Rehabilitation of 35 trains and maintenance of 39 trains


    In November 2021, a memorandum of understanding was signed with a consortium of companies (Spanish CAF - Japanese Mitsubishi) for a period of 3 months, and an offer will be made to modernize the old and new Japanese trains for the line.

Development systems of line 2 metro IMAGES

Development systems of line 2 metro VIDEOS

×