Signing the document of the basic conditions for the management and operation of the three lines of the high-speed electric train network 16/08/2022 | 02:17 PM
Lieutenant-General Engineer / Kamel Al-Wazir - Minister of Transport witnessed the signing of
the basic conditions document for the management and operation of the three lines of the rapid electric train network with a total length of 2000 km between the National Authority for Tunnels and the union of the German railway companies Deutsche Bahn and El Sewedy Electric in preparation for the final contract with it To manage and operate the network for a period of 15 years, renewable for another 15 years, with a total contract period of 30 years. It was signed by Major General/ Sherif Hassan Leil, head of the National Tunnels Authority, and by the German railway alliance Deutsche Bahn and El Sewedy Electric, by Mr. Nico Arbanov, President CEO of Deutsche Bahn International Operations and Eng. Ahmed El Sewedy, Chairman of the Board of Directors of El Sewedy Electric
The Minister of Transport confirmed that this signing comes within the framework of the plan pursued by the state to maximize cooperation with the private sector and benefit from the expertise of international companies in the field of management and operation of modern transport projects, pointing out that the agreement includes the transfer of expertise and carrying out rehabilitation and training work for Egyptian engineers and technicians, which represents the proportion of Egyptian human resources. The company has 90% of the total employees, which is the most important factor in the partnership system between the two sides.
He added that contracting with the German company to manage and operate the high-speed electric train network is an important step in this field, given that Deutsche Bahn is one of the world's leading companies in the field of railway operation and maintenance, as it operates all German railways with a total length of (34 thousand km) and operates a number of A large number of railways in many countries of the world (America - United Kingdom - Denmark - Netherlands - Poland - Canada - Uruguay - India - UAE), and the network will be operated with its three lines through a single operator in the revenue sharing system, pointing out that The German railway company Deutsche Bahn will establish a company under the name Deutsche Ban Egypt, in partnership with El Sewedy Electric, which will manage and operate the network.
It is worth mentioning that the lengths of the fast electric train network (passengers & goods) are 2000 km, where the length of the first line (Ain Sokhna / El Alamein / Matrouh / Fayoum) is 660 km and the second is (Fayoum - Beni Suef - Aswan - Abu Simbel) (1100 km and the third) Qena / Hurghada / Safaga) is 225 km, and its implementation comes in accordance with the directives of the political leadership to expand the establishment of green electric traction projects that are environmentally friendly. This system, which will cover all parts of the Republic, besides being development arteries serving the new and existing urban and industrial areas, will contribute to reducing and shortening the travel time between governorates for more than half the time. Which the citizen currently takes, whether through the old train network or through the current roads linking the governorates, and it also serves the transport of goods between ports and governorates and shortens the time period for transporting these goods