Operation of the first part of the phase 3 of the line 3 passenger subway 09/10/2022 | 09:13 AM
Cinque Terre

Based on the directives of His Excellency President Abdel Fattah El-Sisi, President of the Republic, to operate the first part of the third phase of the third line of the subway for passengers on the occasion of the celebration of the glorious October 6 feasts The Minister of Transport witnesses the start of the trial operation with passengers for the first part of the third phase of the third metro line extending from Ataba station to Kit Kat, passing through Nasser, Maspero and Safa Hijazi stations Minister: 1. The trial operation with passengers will last for a month, and the official opening of the actual operation with passengers during the COP27 climate conference next November 2. The project is considered one of the green, sustainable, environmentally friendly mass transportation that will serve the new republic, whose rules have been established by His Excellency President Abdel Fattah El-Sisi, President of the Republic. 3. I extend my thanks to the people of all the neighborhoods and areas through which the project’s path passed, and all the streets were returned to their original position upon completion of the executive work to serve the movement of citizens Based on the directives of His Excellency President Abdel Fattah El Sisi, President of the Republic, to operate the first part of the third phase of the third line of the subway for passengers on the occasion of the celebration of the glorious October 6 feasts and to facilitate the movement of people in the areas surrounding the High Court and Maspero areas, Zamalek and Kit Kat. Mr. Marc Paretti, Ambassador of France to the Arab Republic of Egypt and Ambassador Christian Berger, Head of the European Union Mission to the Arab Republic of Egypt, leaders of the National Authority for Tunnels and heads of major international companies executing the project in all disciplines The start of trial operation with passengers for the first part of the third phase of the third line of the metro (3A) Which extends from the Ataba station to the Kit Kat station with a length of 4 km, which includes (4) tunnel stations (Nasser - Maspero - Safaa Hegazy - Kit Kat), passing through the tunnel under the Nile from Maspero station to Safaa Hegazy station in Zamalek, after the end of the operating period The pilot without passengers and conducting experiments for the running of the train and tests for signals and control of the path, and where the period of training lasted The trial operation will be without passengers for 3 months, and the trial operation period will be with passengers for a month, provided that the official opening of the actual operation with passengers during the activities of the COP 27 climate conference next November, in addition to the inauguration of a number of other electric traction projects The minister’s visit began with a visit to Nasser station, which is an interchange station with the first metro line, which will have a total area after the opening of this part of the line 10,000 square meters, consisting of 4 floors, 52 ticket gates, 4 automatic ticketing machines (TVM) to obtain tickets, and the number of 37 stairs. Electricity from the street level to the station platform, and His Excellency confirmed that this stage has been implemented at the highest level of quality, as the stations are air-conditioned. People of determination due to the availability of 2 electric elevators in each station from the street level to the sidewalks, and there are prominent tiles on the sidewalks to facilitate the movement of their movements. The Minister also inspected the rest of the stations independently. One of the trains between each two stations started at Maspero Station and then Safaa Hegazy, where the Minister and the audience were received by a number of people from Zamalek and Al Sharbatly Building Those who presented flowers to the Minister of Transport and the delegation accompanying him and thanked His Excellency the President for these giant projects that facilitate the movement of citizens and then the kit as The Minister confirmed that this project will serve this area, which is characterized by a high population density. During his inspection tour, the Minister reassured the presence of all the operating company’s crews and the readiness of the stations to operate, receive and provide the highest level of service to the public. In his speech during the activities of starting the pilot operation for the first part of the third phase of the third metro line, the minister thanked the State of France, the French government and French companies for the fruitful cooperation in implementing subway projects, as well as the European Union and its member states in positive cooperation in various fields of transport, as well as the Egyptian companies implementing projects Underground metros such as the Arab Contractors and Orascom, stressing that the operation of these stations today comes in implementation of the directives of His Excellency the President to serve the people of the areas the project passes through and facilitate their various movements, stressing that this project is not the end but the beginning of completing huge mega projects for green electric mass transportation that are environmentally friendly, such as the train network The completion of the third and fourth phases of the electric light rail, the completion of the second and third parts of the third phase of the third metro line, the implementation of the fourth metro line, the sixth line, the monorail projects, the fast frequency bus, the Abu Qir metro, and the rehabilitation of the Raml tram, all of which are environmentally friendly means of transportation Pointing out that the operation of these stations comes in conjunction with the Egyptian state's celebrations of the glorious October Victory, and that this project is considered one of the modern green mass transportation that will serve the new republic, whose foundations were laid by His Excellency President Abdel Fattah El-Sisi, President of the Republic, who directed the expansion in completing the subway network in parallel With the establishment of a giant transportation network of environmentally friendly electrical traction, which constitutes a major qualitative leap in mass transportation in Egypt, noting that he extends his thanks to the people of all the neighborhoods and areas that the path of the first part passed through and the people of all the neighborhoods and areas that the path of the third phase of this path passes through The giant project to bear the output of traffic diversions

×