Developing second-line systems


  1. Developing the systems of the second metro line


    Some systems will be updated and replaced with new ones, such as signaling, central control and communications systems, and an additional 25-year lifespan will be increased. A study will also be conducted (adding doors on sidewalks - a case study of civil works for the line - a case study of systems not covered by the contrac

  2. The aim of the project


    Raising the efficiency of some systems, such as air conditioning, ventilation, drainage, elevators and railway engineering, and increasing their life span by an additional 25 years. Overcoming the problem of lack of spare parts due to outdated systems Adding some modern systems aimed at improving the service provided to the public of passengers Reducing the cost of maintenance, which will have a return on the economy and reduce operating costs

  3. Second line systems development


    The qualification of 4 alliances (Colas Rail - Alstom - EEB China - Tso France) has been completed in October 2022 to implement system development works.


  4. - Consulting work is being offered to prepare the tender documents and supervise the implementation of the systems development work.

Developing second-line systems IMAGES

Developing second-line systems VIDEOS

×