  1. Development of the line1 systems for the metro Helwan - El Marg


    - Where the development of signaling, communication, central control systems, railway works, electromechanical works and electrical power works will improve the design drop-off time to become (2 and a half minutes instead of 4 and a half minutes) to accommodate the steady increase in the number of passengers using metro lines
    - Cooperating with the Italian Consulting Office Italferr to prepare the administrative documents for the tender of the contractor to implement the works, and to prepare the tender documents for the consultant to supervise the implementation of the works, and he will also do the technical support work for the authority in the stage of tendering, evaluation and selection of both the contractor and the consultant to supervise the implementation
    - Systems development work will be offered to qualified companies (Siemens - Alstom - Colas) and implementation is expected to start in May 2022 for a period of 66 months.
    - A consultant to supervise the implementation of systems development work is currently being selected from the qualified consulting offices.

  2. The aim of the project


    - The regulations of the first line should be in line with the modern trains that will
    be supplied to the line
    - Reduce crowding on the passenger sidewalks.
    - Raising the operating efficiency of the first metro line.
    - Improving the level of safety procedures at stations.
    - Reducing the maintenance cost, which will have a return on the economy and
    reduce the operating cost